In order to stabilize a natural or artificial soil slope, Reshma Earth Movers is pleased to serve as the consultant for execution and to develop the soil nailing technique. We have been successfully employing this technique for the stabilization of the soil slope in a variety of difficult settings. For the purpose of observation and consideration of the details of this approach, the theory of soil nailing has always been made easier by us. It gives us great joy to take this chance to put this technique's applications into practice.
By increasing the normal loads (and thereby the shear strength) on potential sliding surfaces through the nails, which are simply made of steel tendon, the soil nailing technique is used to reinforce the existing ground. The tendon is typically encapsulated in a cement grouted body to prevent corrosion and improve load transfer to the ground.
Being a reputable company, we are focused on providing a variety of Micro Piles Service. These products are created at our manufacturing facility utilizing cutting-edge methods and premium raw materials that are bought from well-known suppliers in the market. Additionally, in order to maintain the quality, our quality analyst examines these products against various industry standards. Features of our Micro piling services:
The material which we were using before: compressor drilling holes for 3" feet has to be drilled 1. electronic delay detornator standard 8/millisecond (EDD) with series connected, 1" no is to used for each hole.2.slurry/emulsion gel catridge 125gm, 2no of sticks is used for each holes,( this 2" explosived are IDEAL brand manufactured) 3. Normal stemming materials, 4. Rubber mats for final covering on top of the blast area with the help of excavator. other: electrical tape, wooden stemming rod, blasting cables, DGMS approved meter and exploder 2no. of skilled labour, govt approved blasting license holder, machinery etc., (0 to 12 mtr), Jack Hammer is attached to one of Excavator for extraction of Hard Rock & Same is carted using Rock Dumpers.
Vertical drilling to required level is carried out with aid of compressor tractors, Holes are drilled at spacing of 300mm c/c using drilling rods in parallel lines of Rock Strata, later SPLIT STONE/BETONAMITE chemical is mixed with water in 1: 3 ratio and thick paste of this mix is filled into each hole and covered thoroughly to stop evaporation. Once this process is completed post 12 hours crack shall be generated upon which Jack Hammer is Engaged to further carry out Breaking of Rock & carting away of same.
Copyright 2022 © REM || Designed By Web Digital Mantra IT Services pvt.ltd